Courseulles OWF Project Monopile Upending Frame and Vibro Hammer Insertion Trolley

Type

Lifting and Upending Systems

Project

Courseulles OWF Project

Customer

Saipem

Country

France

Year

2024

Description

Engineering and Construction of No.1 MP Upending Frame c/w MP Rotation System aroud MP longitudinal axis. The Upending System is suitable for MP with max OD 7750mm, lenght 69 metres and 1029 tons maximum weight. The Vibro Hammer Insertion Trolley located at the opposite extremity of the MP provides the control of all the necessary degrees of freedom to insert the Vibro Hammer into the MP avoiding any clash.

Portfolio

Our Projects

Check out some of the projects we've completed.

Steel Catenary Risers and Umbilicals Pull-in System

Bonga North

Steel Catenary Risers and Umbilicals Pull-in System

Bonga North

Jacket Lifting Tool

Inch Cape OWF

Jacket Lifting Tool

Inch Cape OWF

Secondary Structure Installation Tools

Baltica 2

Secondary Structure Installation Tools

Baltica 2

Internal Lifting Tools

Various

Internal Lifting Tools

Various

Jacket Levelling Tool

COMP2

Jacket Levelling Tool

COMP2

Jacket Pile Grippers

Major Black Sea Project

Jacket Pile Grippers

Major Black Sea Project