Gode Wind 3 and Borkum Riffgrund 3 OWF Projects Secondary Steel Installation Tools

Type

Secondary Steel Installation Tools

Project

Gode Wind 3 and Borkum Riffgrund 3 OWF Projects.

Customer

Jan De Nul

Country

Germany

Year

2023

Description

Engineering and Fabrication of No. 2 Secondary Steel Installation Tools(SSIT) for MPs of 7000/7500mm diameter. In particular: No.1 SSIT for the installation of Anode Cage, Boat Landing and External Ladder and No.1 SSIT for the installation of Suspended Internal Platform and Concrete Workplatform. Supply of Engineering for No. 2 Storage Towers.

Portfolio

Our Projects

Check out some of the projects we've completed.

Steel Catenary Risers and Umbilicals Pull-in System

Bonga North

Steel Catenary Risers and Umbilicals Pull-in System

Bonga North

Jacket Lifting Tool

Inch Cape OWF

Jacket Lifting Tool

Inch Cape OWF

Secondary Structure Installation Tools

Baltica 2

Secondary Structure Installation Tools

Baltica 2

Internal Lifting Tools

Various

Internal Lifting Tools

Various

Jacket Levelling Tool

COMP2

Jacket Levelling Tool

COMP2

Jacket Pile Grippers

Major Black Sea Project

Jacket Pile Grippers

Major Black Sea Project