He Dreiht / Empire OWF Projects Multipurpose Lifting Tool

Engineering and Costruction of No.1 Multipurpose Lifting and Upending Tool for Flanged and Unflanged Monopiles complete with a rotation system for the MP. The system is able to lift and upend MPs with top diameter up to 8 meters and weight up to 1580 tonnes but with its interchangeable system the equipment can cater various […]

Gode Wind 3 and Borkum Riffgrund 3 OWF Projects Secondary Steel Installation Tools

Engineering and Fabrication of No. 2 Secondary Steel Installation Tools(SSIT) for MPs of 7000/7500mm diameter. In particular: No.1 SSIT for the installation of Anode Cage, Boat Landing and External Ladder and No.1 SSIT for the installation of Suspended Internal Platform and Concrete Workplatform. Supply of Engineering for No. 2 Storage Towers.

Courseulles OWF Project Monopile Upending Frame and Vibro Hammer Insertion Trolley

Engineering and Construction of No.1 MP Upending Frame c/w MP Rotation System aroud MP longitudinal axis. The Upending System is suitable for MP with max OD 7750mm, lenght 69 metres and 1029 tons maximum weight. The Vibro Hammer Insertion Trolley located at the opposite extremity of the MP provides the control of all the necessary […]